Single Receipt Transaction for Subcontracted Production

  • Single Receipt Transaction for Subcontracted Production

    Posted by Greg Pope on April 15, 2020 at 7:06 pm
    • Greg Pope

      Member

      April 15, 2020 at 7:06 PM

      I have set up a production route with an external operation with the intention of having the purchase receipt of the service item post the production journals (route, pick list and report as finished). I am succeeding with every step of this with the exception of the report as finished journal.

      For reference, we have followed the steps outlined in the attached article. We are on AX 2012 R3 CU13

      Does anyone have this working in their environment or know what settings I might be missing that would leave out this last step?

      ——————————
      Greg Pope
      Master Scheduler
      Paul Reed Smith Guitars
      Stevensville MD
      ——————————

    • MICHAEL MILLS

      Member

      April 16, 2020 at 8:47 AM

      Hi Greg,
      The attached instructions are really good but after scanning them quickly and mainly looking at the highlights I did not remember seeing anything on matching up the Oper no. between the Route and BOM / Formula Service Item Oper no.

      ——————————
      Michael Mills
      AX D365 Sr. Enterprise Consultant Operations
      Blue Horseshoe Solutions
      Carmel, IN
      ——————————
      ——————————————-

    • Kelly (Kane) Gustafson

      Member

      April 16, 2020 at 9:03 AM

      Which is, of course, a manual entry of the operation number from the Route onto the BOM line where you expect the two to match up. No dropdown. Keep that in mind when matching them up!

      ——————————
      Kelly Kane
      Customer Experience Manager
      Ellipse Solutions LLC
      Dayton OH
      ——————————
      ——————————————-

    • Colby Gallagher

      Member

      April 17, 2020 at 2:05 PM

      The Oper No. field on the BOM line is in fact a drop down if you have an active and approved route that matches the same site, qty and dates as your BOM version.Ā  See item L0101 in USMF demo data.Ā 

      ——————————
      Colby Gallagher
      Managed Application Services Supervisor
      RSM
      OH
      ——————————
      ——————————————-

    • Greg Pope

      Member

      April 17, 2020 at 8:22 AM

      Hi Michael,

      Thanks for taking a look.

      The route has only one operation (external) and the BOM has one stocked item and one service item. Both BOM line items are assigned to the external operation with a flushing principle of finish. At purchase receipt the route journal posts the operation and the picklist journal posts both items in the production order journals. The only missing piece is that there is no report as finished journal being created or posted and the associated production order shows no quantity being reported as finished so no finished items going into inventory.

      That can be done quickly by going to the production order and reporting as finished with only end job checked but it was my understanding the purchase receipt would do this.

      ——————————
      Greg Pope
      Master Scheduler
      Paul Reed Smith Guitars
      Stevensville MD
      ——————————
      ——————————————-

    • MICHAEL MILLS

      Member

      April 17, 2020 at 9:18 AM

      Hi Greg,
      Try adding a second operation to the route with very little run time.
      And add Opt 10 to theĀ  BOM / FormulaĀ  service item Oper No field
      Oper No 10 I’m assuming is the first route step in your current Route.

      ——————————
      Michael Mills
      AX D365 Sr. Enterprise Consultant Operations
      Blue Horseshoe Solutions
      Carmel, IN
      ——————————
      ——————————————-

    • Colby Gallagher

      Member

      April 17, 2020 at 2:12 PM

      It sounds like you don’t have the Production Control Parameter -> Journals -> Automatic Report as finished ticked.Ā  Ā Also please confirm you’re not using a WHS / advanced warehousing warehouse, it doesn’t work well with this process.Ā  Ā  Worst case you can schedule a batch job at Production Control -> Periodic -> Production Orders -> Report as finished to roll through looking for orders with Remain Status = Report as Finished and post the RAF.Ā Ā 

      ——————————
      Colby Gallagher
      Managed Application Services Supervisor
      RSM
      OH
      ——————————
      ——————————————-

    • Greg Pope

      Member

      April 21, 2020 at 1:22 PM

      Thanks Colby,

      That seems to be the case. I checked the Automatic Report as Finished and a post to RAF journal was attempted. It errored out because it wants a license plate location but now I think I’m on the right track.

      ——————————
      Greg Pope
      Master Scheduler
      Paul Reed Smith Guitars
      Stevensville MD
      ——————————
      ——————————————-

    Greg Pope replied 5 years, 4 months ago 1 Member · 0 Replies
  • 0 Replies

Sorry, there were no replies found.

The discussion ‘Single Receipt Transaction for Subcontracted Production’ is closed to new replies.