Validate the sequence operations in Production floor execution

  • Validate the sequence operations in Production floor execution

    Posted by MIGUEL ROMMERS on November 28, 2024 at 2:47 pm

    Hello,

    How can I validate so that an operation is not started after the predecessor in Production floor execution in Dynamics F&O, for example I have operations 10,20,30 in the route, and I try to start job for operation 20 without having executed operation 10 and the system generates a message of error, is this possible to configured and how.

    Thank you

    MIGUEL ROMMERS replied 1 month, 2 weeks ago 2 Members · 2 Replies
  • 2 Replies
  • Joseph Hurylovich

    Member
    November 28, 2024 at 3:05 pm
    Up
    1
    Down
    ::

    In production order default set up, there is a function called quantity validation. When properly configured, it allows a user to start an operation as long as an output quantity was produced from a previous operation. If no quantity was produced out of operation 10, operation 20 would not be allowed, to be started. I’m not in front of my laptop or I would point you to the section. Look into Production Quantity Validation.

  • MIGUEL ROMMERS

    Member
    December 2, 2024 at 8:15 am
    Up
    0
    Down
    ::

    Thank you Joseph for the answer