Validate the sequence operations in Production floor execution
-
Validate the sequence operations in Production floor execution
Hello,
How can I validate so that an operation is not started after the predecessor in Production floor execution in Dynamics F&O, for example I have operations 10,20,30 in the route, and I try to start job for operation 20 without having executed operation 10 and the system generates a message of error, is this possible to configured and how.
Thank you