Get Started Today with MRP

Published November 29, 2021

Log in to watch this session

Already a subscriber? Log in to watch the recording and download the handouts.

Access to this content requires a Subscription plan.

About this session

One of the most underutilized aspects of Dynamics 365 Business Central is the power of the Planning Worksheet for calculating the Master Production Schedule (MPS) and Material Requirements Planning (MRP). This session is designed to give you enough information to start utilizing this amazing tool within BC.

Whether you are in a Manufacturing, Jobs, Service, Distribution, or Retail environment, everyone needs the ability to control their Inventory. The flexibility of the setup allows for implementing the Planning/Requisition Worksheet in almost every install of BC/NAV, as long as you process Items. This session will cover some of the concepts behind the tool, help explain the different setup options and answer questions on how the Planning Engine can work for your environment. Most companies can experience a high ROI by implementing the out-of-the-box planning tools within Dynamics 365 Business Central (and NAV).

Welcome to our new site!

Here you will find a wealth of information created for peopleĀ  that are on a mission to redefine business models with cloud techinologies, AI, automation, low code / no code applications, data, security & more to compete in the Acceleration Economy!