Mastering Manufacturing Capacity & Finite Scheduling in Business Central
Log in to watch this session
Already a subscriber? Log in to watch the recording and download the handouts.
About this session
Most manufacturers struggle to translate real‑world shop floor constraints into an accurate, reliable production schedule. Business Central provides powerful capacity and finite scheduling capabilities, yet many companies underuse them or configure them incorrectly—leading to overloaded work centers, unrealistic start times, and frequent rescheduling chaos.
This session breaks down how BC calculates capacity, queue times, and shop calendars, and shows how “finite capacity” truly works. Attendees will see how to build a stable, realistic schedule using work/machine centers, calendars, routings, setup times, concurrent capacities, and dispatch lists. Real‑world examples illustrate how even small configuration changes can dramatically improve throughput, labor utilization, and on‑time delivery.