Mastering Manufacturing Capacity & Finite Scheduling in Business Central

Published November 12, 2026 1 speaker

Log in to watch this session

Already a subscriber? Log in to watch the recording and download the handouts.

Access to this content requires a Subscription plan.

About this session

Most manufacturers struggle to translate real‑world shop floor constraints into an accurate, reliable production schedule. Business Central provides powerful capacity and finite scheduling capabilities, yet many companies underuse them or configure them incorrectly—leading to overloaded work centers, unrealistic start times, and frequent rescheduling chaos.

This session breaks down how BC calculates capacity, queue times, and shop calendars, and shows how “finite capacity” truly works. Attendees will see how to build a stable, realistic schedule using work/machine centers, calendars, routings, setup times, concurrent capacities, and dispatch lists. Real‑world examples illustrate how even small configuration changes can dramatically improve throughput, labor utilization, and on‑time delivery.

Welcome to our new site!

Here you will find a wealth of information created for peopleĀ  that are on a mission to redefine business models with cloud techinologies, AI, automation, low code / no code applications, data, security & more to compete in the Acceleration Economy!